Page 5 - Doornekamp Lines Logistics Services - An Alternative
P. 5

Rotterdam




 Phase 1 (2021)


 Schedule


 2021 Doornekamp Lines
   ‣ 869 TEU
   ‣ Break bulk cargo
   ‣ Predictable rates
 2021 Picton Terminals

   ‣ 30 acres of available container storage ‣ Container stripping and stuffing
   ‣ Truck gate to gate, 30 minutes or less  facilities on site
   ‣ 200 reefer plugins    ‣ Container commodity loading facilities
   ‣ Integrated truck gate appointment     ‣ 24 hours, 7 days a week Port truck
 (TGA) booking system to guarantee   loading services
 gate to gate in 25 minutes or less.    ‣ Dry bulk container loading facilities
   ‣ Container repair  (soy beans, aggregate, etc.)
   ‣ Diverse break bulk lifting options via
 Mobile Harbour Cranes
   ‣ Various in house last mile trucking
 options, pls ask for pricing


 2 hr one way truck travel to Metropolitan Toronto region









                     Vessels


                     Doornekamp Lines Vessels
 Halifax
                     Geared / Cellular Container Vessel that will be flagged Canada
 Ottawa              in 2021 with a 869 TEU capacity and 200 reefer plugs.

                     Year          2007       Gross Tonnage   9,935 GT
 Picton
 Toronto             Length O.A.   140.70 m   Ice Class      100A
                     Breadth O.A.   23.30 m   Cranes         2x 45T/24m

 Cleveland
   1   2   3   4   5   6   7   8