Page 4 - Doornekamp Lines Logistics Services - An Alternative
P. 4

Phase 1 (2020)


            Schedule


            2020 Doornekamp Lines
            Tuesday / Halifax / Bi-weekly transitioning to weekly service
            Saturday / Picton / Bi-weekly transitioning to weekly service
               ‣ 1,015 TEU weekly capacity      ‣ 20s, 40s, 53s, 120 reefer plugs
              and expanding                 ‣ Break bulk cargo
               ‣ 4 day travel               ‣ Predictable rates
            2020 Picton Terminals
               ‣ 30 acres of available container storage ‣ Various in house last mile trucking

               ‣ Truck gate to gate, 30 minutes or less  options, pls ask for pricing
               ‣ 100 reefer plugins         ‣ Container stripping and stuffing
               ‣ Integrated truck gate appointment   facilities on site
              (TGA) booking system to guarantee     ‣ Container commodity loading facilities
              gate to gate in 25 minutes or less.    ‣ 24 hours, 7 days a week Port truck                                    Halifax
               ‣ Container repair          loading services

               ‣ Diverse break bulk lifting options via  ‣ Dry bulk container loading facilities
              Mobile Harbour Cranes        (soy beans, aggregate, etc.)

               2 hr one way truck travel to Metropolitan Toronto region
                                                        Ottawa







                                                Picton
                                                                                                      Vessels
                                  Toronto

                                                                                                      Doornekamp Lines Vessels
                                                                                                      Geared / Cellular Container Vessel that will be flagged Canada
            First On Board program                                                                    in 2020 with a 1,015 TEU capacity for 20’, 40’, 53' containers and
                                                                                                      120 reefer plugs.
            Customers that book cargo on Doornekamp Lines during the 2020 season
            will receive 24 hours, 7 days a week Port container loading services without              Year          2009      Summer Draft   8.215 m
            additional fees and free storage at Picton Terminals for the 2020 season.                 Length O.A.   145.132 m   Gross Tonnage   9,955 MT
                                                                                                      Breadth O.A.   22.60 m   Cranes x2     40 MT each
   1   2   3   4   5   6   7   8